Below is some information about our Industrial Plating

> Current customer base includes Harley-Davidson, Mechanical Industries and Micro-Precision to name a few.

> Turn-around for the most part is 2 to 3 days after receipt of parts depending on the part's requirements for plating.

> Tanks are statistically monitored on a weekly basis.

> Testing is performed and recorded by a highly trained, on-site chemist.

> We design and build all racks that we utilize.

> Our plating line associates are well-trained operators who follow procedures as outlined in our "Work Instructions".

> Our support inspection associates are rigorously trained in the visual requirements of each part before a single part is packed up.

> Librandi's passed Harley-Davidson's "Supplier System Evaluation". We are ISO 9002 compliant.


> Loading and un-loading areas are available at Librandi's.

> Harrisburg International Airport is within easy reach of Librandi's. Air shipments are simple and quick to make if necessary.

> We are environmentally-friendly. There is a waste water treatment system in-house. All effluent is treated and monitored by the chemist.